Pipeline Modelling For The Lebanese Offshore: Cases In The Oil And Gas Industry
Abstract
Lebanon must build a pipeline system to carry the hydrocarbons from offshore to the shore. With no available
studies and not much experience in this domain, designing a pipeline system in Lebanon is a topic of great
concern. In this research, a prototype sample for the Lebanese offshore pipeline system is designed taking
into consideration different parameters such as the drainage area, skin factor, Dietz shape, production
interval, and the wellhead pressure. The system carries the gas from block 9 offshore Lebanon to a suitable
production platform using different simulation software, mainly PROSPER. Different scenarios are modelled
where results showed an optimum flow rate of 322.834MMscf/day and a wellbore pressure of 6460.73psi at
3000psi wellhead pressure. Further studies are encouraged to be carried out to transport the hydrocarbons
from the wellheads of block 9 to the Zahrani processing plant via specified hydraulics engineering software.
Journal/Conference Information
Jordanian Journal of Engineering and Chemical Industries,DOI: https://doi.org/10.48103/jjeci582022, ISSN: 2616-9584, Volume: 5, Issue: 2, Pages Range: 59-70,